SatelliteFailureRate

Monitored farm

EnBW He Dreiht

64 × Vestas V236-15.0 MW · German North Sea

Not yet validated

The measure that decides whether a rotor is turning has not yet passed its test against metered output. A first check showed it responds to sea state as much as to rotation, so availability figures are held back. The turbine layout, the pass history and every image on this page are real.

Farm availability

Pending

awaiting validation

Clear passes used

40

1,123 turbine looks

Turbines

64

960 MW

Last clear pass

1 Sept 2026

19 turbines visible

Availability here is the share of clear Sentinel-2 looks on which a turbine's rotor was turning while wind at hub height was between 4 and 25 m/s. Figures will appear once the classifier is validated.

10 or more clear looksfewer· click a turbine for its imagery
2 kmN ↑

No turbine selected

Click a turbine on the layout to see how often its rotor was turning, every satellite look since installation, and the imagery itself.

Farm availability by month

Monthly availability appears here once the spin classifier passes validation.

Turbines count from the pass their rotor first appears, so months during installation include commissioning, when erected turbines often stand still before grid connection.

Recent clear passesUTCWind 100 mRotor visibleWind out of rangeNot visible
1 Sept 202610:5510.6 m/s19045
29 Aug 202610:5611.7 m/s8056
27 Aug 202610:5513.5 m/s20044
26 Aug 202610:4610.4 m/s37027
17 Aug 202610:558.5 m/s5059
14 Aug 202610:454.9 m/s6301
12 Aug 202610:554.5 m/s12052
9 Aug 202610:456.4 m/s5806
7 Aug 202610:555.2 m/s39024
4 Aug 202610:459.2 m/s6101
30 Jul 202610:568.3 m/s6200
27 Jul 202610:467.6 m/s5605

How this is measured

Data 7 Mar 20256 Sept 2026 · updated 10 Sept 2026 · Contains modified Copernicus Sentinel data · Turbine positions © OpenStreetMap contributors